Clinton, SC - Calvert Avenue Stream Stabilization (20231212.00.CA)

The proposed design is a combination of imbricated boulder revetment and stream bank grading with matting to avoid the stream from exposing the existing 12-inch sanitary sewer line.
You need to register or login to view files and more project information.

Status

Accepting Bids

Prebid Date 12/18/24 12:00pm
Bid Date 1/3/25 2:00pm

Company & Contacts

WK Dickson & Co., Inc.
Cindy Davidson  

Location

Clinton, SC

For more project information, contact:

Will Rector

W.K. Dickson & Co., Inc.

wrector@wkdickson.com

803.786.4261

Bids will be received for a single prime Contract.  Bids shall be on a lump sum basis as indicated in the Bid Form. The Owner reserves the right to reject any and all bids.

The Project has an expected duration of 30 days.

This project is being funded in whole or in part by the United States Department of Agriculture (USDA), Natural Resources Conservation Service (NRCS). All USDA / NRCS requirements will apply to the contract. All contractors and subcontractors are required to be registered in the federal System for Award Management (SAM) and may not be debarred from doing business with the federal government. Respondents on this work will be required to comply with all applicable federal regulations, including those listed in the Supplementary Conditions (00 73 05) and Funding Requirements (00 73 41).

The Owner hereby notifies all Bidders that it will affirmatively ensure that in any Contract entered into pursuant to this advertisement will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, or national origin in consideration for an Award. The Owner is an Equal Opportunity Employer. Any Contract that uses federal funds to pay for construction work is a “federally assisted construction contract” and must include the equal opportunity clause found in 2 C.F.R. Part 200, unless otherwise stated in 41 C.F.R. Part 60, and encourages all small and minority owned firms and women’s business enterprises to participate. No Bidder may withdraw his/her Bid within (90) days after the actual date of the opening thereof.

The Copeland “Anti-Kickback” Act is also applicable, which prohibits workers on construction projects from giving up wages that they are owed. The Contractor must not appear on the SAM.gov disbarment list.

A detailed listing of all Subcontractors shall be provided by the Bidder. In accordance with the Contract Documents, documentation that the prospective General Contractor and its Subcontractors meet minimum qualifications shall be provided and submitted. Subcontractors must also not appear on the SAM.gov disbarment list. Mark-ups on Subcontractor work or Cost Plus Overhead will be disallowed for reimbursement.

Bidders must comply with the President’s Executive Order No. 11246, as amended, which prohibits discrimination in employment regarding race, creed, color, sex, or national origin.

The Contractor shall comply with the Department of Labor Safety and Health Regulations for construction promulgated under the Occupational Safety and Health Act of 1970 (PL91 596) and under Section 107 of the Contract Work Hours and Safety Standards Act (PL91 54), or latest revisions.

For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.